4.1 INITIAL START-UP REQUIREMENTS

The requirements for the initial start-up of the Benchmark 1.5 Boiler consists of the following:

Complete installation (Chapter 2)

Set proper controls and limits (Chapter 3)

Perform combustion calibration (Chapter 4)

Set up mode of operation (Chapter 5)

Test safety devices (see Chapter 6)

All applicable Installation procedures in Chapter 2 must be fully completed before performing

initial start-up. The initial start-up must be successfully completed prior to putting the unit into

service. Starting a unit without the proper piping, venting, or electrical systems can be

dangerous and may void the product warranty. The following start-up instructions should be

followed precisely in order to operate the unit safely and at a high thermal efficiency, with low

flue gas emissions.
Initial unit start-up is to be performed ONLY by AERCO factory trained start-up and service

personnel. After performing the start-up procedures in this Chapter, it will be necessary to

perform the Mode of Operation settings in Chapter 5, and the Safety Device Testing procedures

in Chapter 6 to complete all initial start-up requirements.

AERCO Gas Fired Startup Sheets, included with each Benchmark Boiler, must be completed for

each unit for warranty validation. A copy of these sheets must be returned promptly to AERCO

at:

AERCO International, Inc.

159 Paris Ave.

Northvale, NJ 07647

WARNING

DO NOT ATTEMPT TO DRY FIRE THE BOILER.

STARTING THE UNIT WITHOUT A FULL WATER LEVEL

CAN SERIOUSLY DAMAGE THE UNIT AND MAY RESULT

IN INJURY TO PERSONNEL OR PROPERTY DAMAGE.

THIS SITUATION WILL VOID ANY WARRANTY.

All applicable installation procedures in Chapter 2 must be

completed before attempting to start the unit.

4.2 TOOLS AND INSTRUMENTATION FOR COMBUSTION

CALIBRATION

To properly perform combustion calibration, the proper instruments and tools must be used and

correctly attached to the unit. The following paragraphs outline the necessary tools and

instrumentation as well as their installation.