36cdvt vertical venting, Cdv series direct vent gas fireplace, How to use the vent graph – Vermont Casting 36CDVTRN User Manual

Page 20

Advertising
background image

20

CDV Series Direct Vent Gas Fireplace

20010175

FP1022

Typical Straight Up Installation

1/26/00 djt

50’

(15 m)

Storm Collar

Roof Flash-

ing

Vent

Termination

Roof

2’ Min.

Roof Support

Attic Insulation

Shield

Attic

Insulation

Joists

Joists

FP1022

Fig. 36 Typical straight-up installation.

Min.

2' (610 mm)

FP1185

Fig. 37 Minimum termination to roof clearance.

How to Use the Vent Graph

The vent chart should be read in conjunction with the
following vent installation instructions to determine the
relationship of the vertical and horizontal dimensions of
the vent system.
1. Determine the height of the center of the horizontal

vent pipe exiting through the outer wall. Using this
dimension on the Sidewall Vent Graph (Fig. 38),
locate the point intersecting with the slanted graph
line.

2. From the point of this intersection, draw a vertical

line to the bottom of the graph.

3. Select the indicated dimension, and position the

fireplace in accordance with same.

Example A:
If the vertical dimension from the floor of the fireplace
is 11’ (3.4 m) the horizontal run to the face of the outer
wall must not exceed 14’ (4.3 m).
Example B:
If the vertical dimension from the floor of the unit is 7’
(2.14 m), the horizontal run to the face of the outer wall
must not exceed 8¹⁄₂’ (2.6 m).

36CDVT Vertical Venting

Horizontal dimension from the outside face of the

wall to the center of the fireplace vent flange

Sidewall vent graph showing the relationship between vertical

and horizontal dimensions for a Direct Vent flue system.

V

ertical dimension from the fl

oor of the unit

to the center of the horizontal vent pipe

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

eg: A

eg: B

CFM102

DV Graphic

9/28/00 sta

Fig. 38 Sidewall venting graph. (Dimensions in feet)

9. Install storm collar and seal around the pipe.
10. Add additional vent lengths for proper height. (Fig

37)

11. Apply high temperature sealant to 4” and 7” collars

of vertical vent termination and install.

Advertising