CDV Series Direct Vent Gas Fireplace

20010175

BG402a

Top Vent

Below grade installation

1/26/00 djt

Firestop

7” Pipe

7TDVSNORK

(Snorkel)

4” (102mm)

Clearance

Min.

Window

Well

Gravel

Drain

BG402

Fig. 48 Below grade installation.

Zero Clearance Sleeve

(if required)

*A minimum of 24” (610mm) ver-

tical pipe must be installed when

using the 7TDVSNORK Kit.
*The 22” (559mm) vertical rise

(center to center) of the snorkel

may be included for calculationof

max. horizontal run.

24” (610mm)

Minimum*

Screws

Foundation Wall

Do not back fill around snorkel. A clearance
of at least 4” (102 mm) must be maintained
between snorkel and the soil.

If the foundation is recessed, use recess brackets (not
supplied) for securing lower portion of the snorkel.
Fasten brackets to wall first, then secure to snorkel
with self drilling #8 x 1/2 sheet metal screws. It will be
necessary to extend vent pipes out as far as protruding
wall face. (Fig. 49)

BG401

Snorkel

2/10/99 djt

Foundation Recess

Snorkel

Wall Screws

Recess Brackets

Watertight Seal

Around Pipe

Sheet Metal

Screws

BG401

Fig. 49 Snorkel installation, recessed foundation.

Vertical Through-the-Roof Applications

This Gas Fireplace has been approved for:

Vertical installations up to 40’ (12 m) in height. Up
to a 10’ (3 m) horizontal vent run can be installed
within the vent system using a maximum of two 90°
elbows. (Fig. 50)

Max. 10' (3m)

Max. Height

40' (12m)

Min. Height

7���' (2.3m)

FP1244

through the roof

max/min dims

12/02

Pipe Straps Every

3’ (914mm)

FP1244

Fig. 50 Support straps for horizontal runs.

Up to two 45° elbows may be used within the
horizontal run. For each 45° elbow used on the
horizontal level the maximum horizontal length must
be reduced by 18” (457 mm).

Example: Maximum horizontal length
0 x 45° elbows = 10’ 93 m)
1 x 45° elbows = 8¹⁄₂’ (2.6 m)
2 x 45° elbows = 7’ (2.1 m)

A minimum of an 8’ (2.4 m) vertical rise.

Two sets of 45° elbows offsets within these vertical
installations. From 0 to a maximum of 8’ (2.m) of
vent pipe can be used between elbows. (Fig. 51)

7DVCS must be used to support offsets. (Fig. 53)
This application will require that you first determine
the roof pitch and use the appropriate starter kit.
(Refer to Venting Components List)

The minimum height of the vent above the highest
point of penetration through the roof is 2’ (610 mm).
(Fig. 55)