Page 7

Mighty Therm Boilers, models HH and PH, 175

and 250, require that vent dampers be installed. The

vent damper relay (supplied with the controller) is

plugged into this connection, but no other

connections are made to the relay. The function of

the relay is to close connections internal to the

control board.

ID Tag Port - J2

ID tag must NEVER be removed. Do not

tamper with this connection at any time.

To LCD Panel - J4

An additional LCD (controller display) can be

connected here and remote mounted up to 500 feet

away from the LLS. This is for display only. Changes

cannot be made, and the control cannot be reset from

the remote display.

SECTION 4.

Factory Installed Connections

The following connections are made at the

factory, if required, and descriptions are provided

here for informational purposes only. Some

connection points are not functional on the LLS-1,

and will not be used. Contact the factory before

modifying any of these connections. The LLS-1 has

several operating parameters that can be changed to

ensure that the boiler operation best meets the needs

for your application. See Section 5 and 6 for specifics

about programming options.
Inlet Temp Sensor - J7

This connection is made at the factory for the

temperature sensor on the boiler/heater inlet.
Outlet Temp Sensor - J8

This is the factory connection for the

temperature sensor on the boiler/heater outlet.
Water Level Sensor - J9

This connection is made at the factory on units

that are ordered with the Low Water Cutoff option,

or other options that include a Low Water Cutoff.
Water Flow Sensor - J10

This connection is made at the factory, for the

water flow sensor (flow switch).
Tran Sec - J6

This is the factory connection for the unit’s

transformer.
Gas V-5 H-Volt - J22

Not used on LLS-1

Gas V-6 H-Volt - J21

Not used on LLS-1

Valve Gas 2 - J18

This connection is made at the factory to

control safety gas valve or stage.
Valve Gas 1 - J17

This connection is made at the factory to

control safety gas valve or stage.
Blocked Vent Sw - J13

This is the factory connection for a unit that is

equipped with a blocked vent switch.
Venturi Sw - J16

This is the factory connection for a unit that is

equipped with a venturi pressure switch.
Roll Out Sw - J14

This connection is made at the factory on units

that are equipped with roll-out switches.
Fuse Link - J15

This is the factory connection for a unit that is

built with a fusible link.
Gas Valve 3 Relay - J26

Not used on LLS-1

Gas Valve 4 Relay - J25

Not used on LLS-1

Gas Valve 5 Relay - J24

Not used on LLS-1

Gas Valve 6 Relay - J23

Not used on LLS-1

ID Tag Port - J2

ID tag must NEVER be removed. Do not

tamper with this connection at any time.
To LCD + Keyboard - J3

This connection is made at the factory, for the

LLS display and keypad. Additional remote LCD

panel must be connected to J4.

SECTION 5.

Programmable Parameters

See Section 6 For Programming

Instructions

The LLS-1 has several operating parameters

that can be changed to ensure that the boiler

operation best meets the needs for your application.

The following is a list of the programmable

parameters, minimum and maximum values, and

defaults. NOTE: Laars controls boiler water

temperature at inlet.

OUT OF