5.1 Operation Process

1 Ensure there is enough water in the water tank and that the waste water tank is

empty.

To empty water from waste water tank, use water drain plug in the side of the water

tank and drain water.

If you want to drain water from water tank, the user can lay flat the drain tube.

2 Connect power and switch on, put articles into chamber when screen indicates

ready and then close the door.

3 Select correct program according to articles being sterlizied.

Press “▲” key,screen will in turn display 1#instrument, 2#instrument bag, 3#dressing,

4#rubber, 5#B&D test, 6# vacuum test program and related menu. As following:

Press “set” key, screen display mode shows as following:

Press“▲”key or“▼” key,select pre-heating mode,print mode or date and start to set.

For example, if you want to set the pre-heating mode, the background is clear after this

mode is selected, then press “set” key, the value will flicker and now user can press “▲”

or“▼” to adjust. Press “Esc” when setting is finished.

Program

Sterilization
temperature

Sterilization

time

Dryness time

1# instrument

134

4min

2min

2#instrument bag

134

4min

10min

3# dressing

134

6 min

15min

4# rubber

121

20 min

5min

5# B&D test

134

3.5 min

2 min

6#vacuum test

Test vacuum leakage rate of autoclave

Mode set

Pre-heating mode: Close

Print mode: Open