Chapter 3 installation, 1 installation procedures – LABEC Shinva-45N User Manual

Page 7

Advertising
background image

5

u

Safety valve of auto release against overpressure:It opens when the designated

pressure is surpassed.

u

Circuit safety device: AC loop short protection.

Chapter 3 Installation

3.1 Installation Procedures

3.1.1 Placement of the Autoclave

Position the equipment on a level and firm surface in a room with good ventilation,

adjust the foot screws to make the equipment level. Allow at least 25cm ventilation space
on all sides of the equipment.

3.1.2 Water Preparation

Water quality:

u

Conductivity less than 15µS/cm

u

Bleacher content:≤2mg/l

u

PH value is 5—7

u

Hardness:≤0.02mmol/l

5 c m

25

cm

2 5 c m

2 5 c m

5 8 0

6 2 0

82

8

12

00

Advertising
This manual is related to the following products: