Electrical information, Figure 13. vshe blower control board, Figure 12. two-stage, hot surface ignition – Reznor R6GI Unit Installation Manual User Manual

Page 30: Blower control board, From low to high heat mode. see, Operation located on the blower control board. see, Figure, For dip switch location

Advertising
background image

30

Electrical Information

Figure 12

Figure 12.

Two-Stage, Hot Surface Ignition & Blower Control Board

Automatic Heat Staging

(Used with Single Stage

Heating Thermostat Only)

Low Voltage Control

Circuit (3 Amp Fuse)

Blower

Interface

Connection

Heating Mode

Blower Off Delay

Yellow = Flame Sense

(See

OPERATING SEQUENCE

&

Table 9

)

Ignition Control Fault

Red & Green LED’s

(See

OPERATING SEQUENCE

&

Table 9

)

Figure 13

Output Relay

Red LED’s

Input

Dehumidification

Terminal

Ignition Control

Interface Connection

Inverter

Interface

Connection

Blower

Interface

Connection

Blower CFM

Dipswitch

Settings

Figure 13. VSHE Blower Control Board

Status LED’s

Red & Green

(See

Table 10

)