Electrical information, Figure 13. vshe blower control board, Figure 12. two-stage, hot surface ignition – Reznor R6GI Unit Installation Manual User Manual
Page 30: Blower control board, From low to high heat mode. see, Operation located on the blower control board. see, Figure, For dip switch location
Advertising
30
Electrical Information
Figure 12
Figure 12.
Two-Stage, Hot Surface Ignition & Blower Control Board
Automatic Heat Staging
(Used with Single Stage
Heating Thermostat Only)
Low Voltage Control
Circuit (3 Amp Fuse)
Blower
Interface
Connection
Heating Mode
Blower Off Delay
Yellow = Flame Sense
Ignition Control Fault
Red & Green LED’s
)
Figure 13
Output Relay
Red LED’s
Input
Dehumidification
Terminal
Ignition Control
Interface Connection
Inverter
Interface
Connection
Blower
Interface
Connection
Blower CFM
Dipswitch
Settings
Figure 13. VSHE Blower Control Board
Status LED’s
Red & Green
)
Advertising