Field controls – Slant/Fin TRDV Series Venting User Manual

Page 14

Advertising
background image

14

TRDV SERIES

JOINT ASSEMBLY: VENT PIPE TO TERMINATION

AND APPLIANCE ADAPTER
If necessary, the vent pipe may be cut to length with a hacksaw or

cut off saw.

CAUTION: Use safety glasses and other appropriate safety gear.
1. Pull outer vent pipe back 1”-2” from inner vent pipe end and

remove insulation (Figure 22).

2. Slide Cover Sleeve onto end of vent pipe a few inches back

from end of outer vent pipe (Figure 22).

3. Slide Cover Ring over stop bead on termination inner pipe or

appliance adapter (Figure 22).

4. Assemble inner pipe clamp halves using the supplied

1

4

” bolts

and square nuts, and position inner pipe clamp

1

4

” from end of

inner pipe (Figure 22).

5. Remove all oil and grease from end of termination inner pipe

or appliance adapter, and apply a bead of sealant to between

the stop bead and retainer bead (Figure 23).

6. Apply a thick bead of sealant to inside of inner vent pipe

1

2

from the end of pipe, working the sealant into the corrugations

(Figure 23).

7. Push the inner vent pipe onto the termination inner pipe or

appliance adapter all the way up to the stop bead.

8. Tighten the inner pipe clamp bolts until both clamp halves are

within 1/8" of each other at each end (Figure 24).

9. Slide the cover sleeve and cover ring together to engage the

ring in the groove of the sleeve, and tighten the cover sleeve

clamp (Figure 25).

10. To maintain 1" clearance to combustibles, wrap minimum

1-1/2" thick ceramic insulation (installer-supplied) around the

exposed portion of the termination inner pipe (Figure 25), and

secure with foil tape (installer supplied).

Page 4

Figure 22

Figure 23

Figure 25

Figure 24

FIELD CONTROLS

REFER TO PAGE 8 FOR VACUUM RELIEF VALVE CONNECTIONS AND VENT SYSTEM PART NUMBERS

Advertising