Section vii – Maytag MC2 User Manual

Page 31

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

SECTION VII

PROCEDURE FOR FUNCTIONAL CHECK OF

REPLACEMENT COMPONENTS

1. Microprocessor (computer) Board

a. Upon completing installation of the replacement microprocessor (computer) board,

reestablish power to the dryer.

b. Start the drying cycle.

c. Verify that the motor(s) and the heat indicator dots, in the microprocessor (computer) L.E.D.

display are on. (Refer to the illustration below.)

m

OPL (NON-COIN) REVERSING MODELS ONLY.

d. Verify that motor(s) heat, and door indicator lights on the back side of the microprocessor

(computer) board are lit. (Refer to illustration below.)

e. Open main door. The dryer must stop and ALL output indicator lights on the back side of the

microprocessor (computer) board must go out.

f. Try to restart the dryer with the main door open.

27

Advertising