Installation installation – STIEBEL ELTRON DHB-E 13 SL User Manual

Page 30

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

INSTALLATION
INSTALLATION

Phase connection

I-1 Connect the phase that switches the load shedding

relay to the indicated terminal of the mains terminal

in the appliance.

1

Control cable to the contactor of the second appliance (e.g.

electric storage heater).

2

Control contact, opens when switching the instantaneous

water heater on.

9.5.5

Water installation for finished walls

Suitable pressure taps WKMD or WBMDfor installation on finished

walls are available as special accessaries.

»Fitthe water plugs with gaskets to seal the connection (below

the plaster). With Sliebel Eltron pressure taps, plugs and gaskets

are part of the standard delivery. For third party pressure taps,

plugs and gaskets can be ordered as special accessories.

»Install the tap.

» Push the lower partof the back panel under the connection pipes

of the pressure tap and click it into place in the back panel.

»Secure the connection pipes to the appliance.

9.5.6

Water installation for finished walls with solder/

compression fitting

With

the

special

accessories

"solder

fitting"

or

"compression

fitting" (see "Special accessories"), copper or plastic pipes can be

connected in installations for finished walls.

With special accessory "solder fitting", a threaded connection with

on-site 12 mm copper pipes is possible. For this the following

steps are required:

» Push the union nuts over the connection pipes.

» Solder the inserts to the copper pipes.

»Push the lower part of the back panel underthe connection pipes

and click it into place in the back panel.

»Secure the connection pipes to the appliance.

Valve installation information,

l-l Observe the valve manufacturer’s installation

instructions.

9.5.7

Water installation for finished walls, fitting the
appliance cap

The following steps are necessary to complete the appliance cap

installation.

y>

Cleanly break out the knock-out in the appliance cap. If necessary,

use a file.

» Break the tabs out of the cap guides.

Installation information if tap pipes are slightly offset.

The appliance can be sealed by fitting the cap guides

with tabs if the tap pipes are slightly offset. ’The back

panel guides are not required in this case.

»Clickthe cap guides provided into place in the knock-outs.

»Position the back panel guides on the pipes and push them

together. Then push the guides until they meet the back panel.

»Secure the back panel at the bottom with a screw. This

is also relevant if flexible water supply systems are used.

1

Knock-out

2

Cap guides

3

Back panel guides

k

Screw

9.5.B Split lower part of back panel

With threaded connections forfinished walls.the lower part of the

back panel can also be installed after fitting the taps:

y>

Saw cut the centre section of the lower part of the back panel.

»Insert the pipes from the separate pack from behind into the

centre section.

y>

Route the centre section under the pipes and push it upwards.

30 I DHB-E ... SiL electronic

vrww.stiebeL-eltron.com

Advertising