Handling the chassis, Handling cables, Cleaning the exterior – ADLINK PXIS-2508 User Manual

Page 58: Power requirements

Advertising
background image

48

Appendix

WARNING Make sure the fan blades do not come in contact with the

air filter.

7. Replace the fan tray cover, then re-install the fan tray to

the chassis.

8. Connect all cables, then turn on the system.

Handling the Chassis

While the PXIS-2508/2558T is an ultra-portable testing system, it
is recommended that you transport or carry the chassis using the
handles. The handles are designed to carry the weight of the
chassis for superior portability and balance.

Handling Cables

Treat all cables with care. Do not over extend any cable to prevent
internal breaking. All cables and plugs must be handled or con-
nected properly.

Cleaning the Exterior

Make sure that you turn the system off before cleaning the chassis
exterior. Wipe the exterior with a clean cloth starting from areas
that easily accumulate dust or dirt such as the area in and around
the chassis and power supply air inlet apertures.

Power Requirements

Make sure that the power cord is in good condition before plugging
it into the system. You also need to check the reliability of the
power source. The PXIS-2508/2558T power supply is capable of
handling 100 V to 240 V AC within the 50 Hz to 60 Hz range. Do
not connect the PXIS-2508/2558T on an already overloaded cir-
cuit.

Advertising