Jt5 operator’s manual – Ditch Witch JT5 User Manual
Page 37
Advertising
Controls - 36
JT5 Operator’s Manual
ESID
CMW
6.
OK indicator
Green light means system
self test detected no
problems.
Strike system is ready to
operate.
7.
Electrical power supply
indicator
Green light means control
box has sufficient electrical
power for operation.
Strike system is ready to
operate if OK indicator is also
on.
8.
Self test button
To start manual self test,
press.
To reset system after a strike
has been detected, press.
Checks all systems and circuits.
NOTICE: See “If an Electric Line is
Damaged” on page 18.
Item
Description
Notes
Advertising