Jt5 operator’s manual – Ditch Witch JT5 User Manual

Page 88

Advertising
background image

JT5 Operator’s Manual

Conduct a Bore - 87

Assemble Backream String

CMW

1.

Select backreaming devices. See “Backreamers” on page 112.

2.

Determine fluid rate requirements and install appropriate nozzles to provide sufficient flow. See
“Backream Fluid Requirements” on page 113 and “Nozzles” on page 110.

3.

Attach backreamer to backream beacon housing if tracking backream.

4.

Install beacon, following beacon instructions for:

battery replacement

beacon positioning

5.

Install beacon housing lid. See “Beacon Housings” on page 111.

6.

Follow beacon instructions to check beacon operation.

7.

Follow tracker instructions to calibrate beacon.

8.

Connect EZ-Connect joint or use quick wrench to attach backreamer/beacon housing assembly to
transition sub. See “Quick Wrench” on page 115.

9.

Attach pullback devices or product to end of backreamer/beacon housing assembly.

Advertising