Check supplies and prepare equipment, Check supplies, Jt5 operator’s manual – Ditch Witch JT5 User Manual

Page 62

Advertising
background image

JT5 Operator’s Manual

Prepare - 61

Check Supplies and Prepare Equipment

CMW

Check Supplies and Prepare Equipment

Check Supplies

•

receiver/transmitter or tracker with spare batteries

•

beacons with new and spare batteries

•

two-way radios with new and spare batteries

•

quick wrench (see page 115)

•

transition sub

•

anchoring equipment and accessories

•

bits, screens, nozzles (see page 110)

•

adapters, pipe, beacon housings

•

marking flags or paint

•

water and additional hoses

•

fuel (Use low sulfur or ultra low sulfur fuel only.)

•

drilling fluid additives (see page 102)

•

spare fuses

•

keys

•

backreamers, swivels, pulling devices (see page 110)

•

wash down hose and spray gun

•

duct tape

•

spray lubricant

•

tool joint compound (see page 130)

•

electrically insulating boots and gloves

•

personal protective equipment, such as hard hat and safety glasses

•

notepad and pencil

Advertising