Planning, Setting up at jobsite, Jt5 operator’s manual – Ditch Witch JT5 User Manual
Page 45
Advertising

Operation Overview - 44
JT5 Operator’s Manual
Planning
CMW
Planning
1.
Gather information about jobsite. See page 49.
2.
3.
Classify jobsite. See page 52.
4.
5.
Check supplies and prepare equipment. See page 61.
6.
Setting Up at Jobsite
1.
2.
Unload drilling unit from trailer. See page 70.
3.
Assemble drill string. See page 79.
4.
Position drilling unit and frame. See page 75.
5.
Assemble strike system. See page 95.
6.
Anchor drilling unit. See page 93.
7.
Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.
Advertising