Leaving jobsite, Storing equipment, Jt5 operator’s manual – Ditch Witch JT5 User Manual
Page 47
Advertising
Operation Overview - 46
JT5 Operator’s Manual
Leaving Jobsite
CMW
Leaving Jobsite
1.
Remove downhole tools. See page 89.
2.
3.
Rinse unit and downhole tools. See page 124.
4.
Disassemble strike system and disconnect from fluid system. See page 125.
5.
6.
Load unit onto trailer. See page 68.
Storing Equipment
1.
For cold weather storage, antifreeze drilling unit. See page 122.
2.
For long-term storage, disconnect battery disconnect switch.
Advertising