Ditch Witch JT2020 User Manual

Page 183

Advertising
background image

Service - 182

JT2020 Mach 1 Operator’s

Manual

1000 Hour

CMW

Lube Rotation Gearbox Internal Splines

Lube rotation gearbox internal splines with EPG every 1000 hours.

To lube:

•

Turn battery disconnect switch to the off position.

•

Clean rotation gearbox area with pressure washer to remove grime.

•

Disconnect hose and remove water swivel.

•

Using special socket, remove thrust locknut, tang lock washer, and nut.

•

Remove sliding shaft from front side of gearbox. Clean and dry all components.

•

Coat internal splines in gearbox with EPG.

•

Reinstall shaft and components in reverse order of removal.

•

Apply EPS spray lube to sliding shaft surfaces. See page 176.

•

Turn battery disconnect switch to the on position.

Advertising