Attach transition sub – Ditch Witch JT2020 User Manual
Page 99
Advertising

Conduct a Bore - 98
JT2020 Mach 1 Operator’s Manual
Assemble Drill String
CMW
Attach Transition Sub
Use either machine torque or quick wrench to attach transition sub (2) to beacon housing (1).
Machine Torque
1.
Pull beacon housing into front wrench.
2.
Close wrench.
3.
Lube joints.
4.
Slowly make up joint.
5.
Use full machine torque to tighten joint fully.
Quick Wrench
1.
Lube joints with TJC.
2.
Moving tools will kill or injure. Shut off drill string power when anyone can
be struck by moving or thrown tools. Never use pipe wrenches on drill string.
Advertising