Planning, Setting up at jobsite – Ditch Witch JT2020 User Manual
Page 61
Advertising

Operation Overview - 60
JT2020 Mach 1 Operator’s Manual
Planning
CMW
Planning
1.
Gather information about jobsite. See page 65.
2.
3.
Classify jobsite. See page 68.
4.
5.
Check supplies and prepare equipment. See page 76.
6.
Setting Up at Jobsite
1.
2.
Unload drilling unit from trailer. See page 88.
3.
Assemble drill string. See page 97.
4.
Position drilling unit and drill frame. See page 93.
5.
Assemble strike system. See page 116.
6.
Anchor drilling unit. See page 115.
7.
Connect fluid system. See page 93.
8.
Calibrate tracker with beacon that will be installed in beacon housing. See tracker operator’s manual.