4 installation - controls, 7 installation of the remote control, 8 electrical connection of the remote control – Glow-worm Clearly Heat Recovery User Manual

Page 15

Advertising
background image

15

4 Installation - Controls

4.7 Installation of the Remote Control

Site the remote control on an inside wall at a height of about

1.5 m, were the controller is able to detect the circulating

ambient air clearly and unimpeded from furniture, curtains or

other external influences. The position should be selected so

that neither air drafts from the door or the window nor heat

sources such as radiators, TV or solar irradiation may directly

influence the controller.

A connection with the ventilation unit is established via a

2-core connection cable.

Pull the remote control from the wall base.

Refer to diagram 4.7.

With due regard to the position of the cable entry, mark the

wall base securing points on the wall. Using a 6mm diameter

drill and fixings supplied, secure the wall base to the wall

having first pulled the cable through the cable entry.

Connect the cable to the corresponding terminals (eBUS “+”

and “-”) on the terminal connecting strip.

Place the control on to the wall base such that the pins at the

back of the upper part locate into the seats.

Press the casing to the wall base till it locates, taking care not

to bend the controller connection pins. Make sure that you do

not bend the contacts.

4.8 Electrical Connection of the Remote

Control

IMPORTANT: Switch off the mains supply to the unit before

starting to work.

To prevent accidents, electric installation can only be carried

out by a

competent person approved at the time by the

Health and Safety Executive.

The remote control is connected to the ventilation unit via

a two-core cable. Communication is via a 2-pole eBUS.

The eBUS connector is sized to accommodate wiring of 2 x

0.75 mm

2

(recommended). It is possible to interchange the

connections without affecting communication. This connection

is at the bottom of the unit.

Connect the control cable as shown in diagram 4.8, to the

eBUS-clamps + and -.

Diagram 4.7

SECURING

POINT

SECURING

POINT

WALL BASE

TERMINAL

STRIP

CONTROL

CASING

15544

15543

Diagram 4.8

15545

eBUS

CONNECTION

VIEW ON UNDERSIDE OF UNIT

Advertising