3 hydraulics installation, 1 carrying out the hydraulics installation, Assembly and installation 5 – Glow-worm Envirosorb3 User Manual

Page 15

Advertising
background image

Assembly and installation 5

0020154078_03 Envirosorb₃ Installation instructions

15

– Maximum length: ≤ 8 mm

2.

Align the product horizontally so that condensate can
flow.

Note
The product must be installed with the vi-
bration-isolating feet supplied. The product
is lifted by the vibration-isolating feet, which
simplifies the condensate-discharge process
and reduces vibrations.

3.

Screw in the vibration-damping feet using the concrete
foundation.

Note
The concrete foundation must not be joined
to the house foundations.

5.3

Hydraulics installation

In heating installations that are equipped primarily with ther-
mostatic or electrically controlled valves, a constant and suf-
ficient flow through the heat pump must be ensured. Irre-
spective of which heating installation is selected, the min-
imum volume of circulating heating water (40% of the nom-
inal flow, see the technical data table) must be guaranteed.

5.3.1

Carrying out the hydraulics installation

Caution.
Risk of damage caused by residue in the

heating flow and return.
Residue from the pipelines, such as welding

beads, scale, hemp, putty, rust and coarse

dirt, may be deposited in the product and

cause malfunctions.

Flush the heating installation thoroughly

before connecting the product in order to

remove any possible residue.

Caution.
Risk of material damage due to corrosion.
If plastic pipes that are not diffusion-tight are

used in the heating circuit, this may lead to

corrosion and deposits in the heating circuit

and in the product.

Do not treat the water with corrosion pro-

tection agents if plastic pipes that are not

diffusion-tight are used.

Danger!
Risk of material damage caused by sol-

dering work.
Carrying out soldering work on lines that

have already been installed may damage the

seals.

Solder the lines before installing the

product.

1.

Insulate the lines (including those running below
ground) with UV-resistant and high-temperature-res-
istant insulation between the product and the heating
installation.

2.

In order to avoid transferring vibrations to the surround-
ing buildings, use flexible connection pipes on the
product that have a length of at least 0.75 m.

3.

When the product is not installed at the highest point in
the heating circuit, install additional purging valves in
suitable places.

4.

Install the following accessories in the heating return.

Installation without decoupling hydraulic module

Drain cock

Air separator (if required)

Dirt filter

An expansion vessel suitable for the complete hydraulic
installation

Expansion relief valve 0.3 MPa (3 bar)

Pressure gauge (recommended)

Maximum length of the
heating circuit

DN 26

DN 28

When using a hydraulic
module without an expansion
vessel

50 m

30 m

Note
If you use glycol, you must collect it at the
expansion relief valve to prevent environ-
mental pollution.

0.75 m min.

1

4

5

6

7

3

2

1 Connection hose in the

heating flow to the building
(on-site)

2 O-ring seal

3 Covering cap

4 Heating flow connection

(diameter 1 1/4") to the
building

5 Heating return connection

(diameter 1 1/4") to the
heat pump

6 Connection hose in the

heating return to the heat
pump (on-site)

7 Insulation (on-site)

5.

Remove the covering caps (3) from the product's hy-
draulic connections.

6.

Install a dirt filter in the heating circuit return between
two stop valves so that the filter can be cleaned regu-
larly.