3 laying the 24 v cabling, 4 installing the cable duct, 5 assembly and installation – Glow-worm Envirosorb3 User Manual

Page 18

Advertising
background image

5 Assembly and installation

18

Installation instructions Envirosorb₃ 0020154078_03

5.4.3

Laying the 24 V cabling

X4

X9

EBUS

X7 FLOOR H

3

1

2

1 eBUS connection in the

heat pump (observe the
polarity)

2 Limit thermostat connec-

tion (underfloor protective
circuit)

3 eBUS connection in the

heat pump control module

1.

Feed the cable through the cable duct.

Envirosorb

3

5

Envirosorb

3

8

Envirosorb

3

11

Envirosorb

3

15

Recommended eBUS cable dimen-
sion

2 x 0.75 mm²

Recommended cable dimension for
eBUS + limit thermostat

4 x 0.75 mm²

2.

Connect the eBUS cable to the system controller.

3.

If you install a limit thermostat (e.g. 50 °C) in the heat-
ing circuit flow, remove the bridge from terminal (2) and
connect the limit thermostat to this terminal.

5.4.4

Installing the cable duct

Caution.
Risk of malfunction due to incorrect rout-

ing of the supply lines.
If you route the supply lines for the power

supply and the eBUS line through the same

cable duct, the signal will be disrupted.

▶

Route the supply lines for the power sup-

ply and the eBUS line through various

cable ducts in the product.

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

1

2

3

4

ØA

ØA

1

2

1 eBUS line and limit ther-

mostat line cable duct

2 Power supply cable duct

1.

Measure the diameter of the cable.

2.

Drill a hole the same size as the cable diameter in the
cable duct.

3.

Route the cable through the cable duct.

4.

Tighten the cable duct with two open-end spanners.

Advertising