9 boiler installation – Glow-worm Xtrafast 96-120 User Manual

Page 14

Advertising
background image

14

2000221595

9.1 Statutory requirements

The installation of this boiler must be carried out by a qualified
registered person in accordance with the relevant requirements
of the current issue of:

The Gas Safety (Installation and Use) Regulations

The Building Regulations

The local water company Byelaws

The Building Standards Regulations (Scotland)

The Health and Safety at Work Act

9.2 Sheet metal parts

WARNING. When installing or servicing this boiler, care should
be taken when handling the edges of sheet metal parts to avoid
the possibility of personal injury.

9.3 Installing the boiler

Prior to starting work, the system must be thoroughly flushed
using a propriety cleanser such as Sentinel X300 to eliminate
any foreign matter and contamination e.g. metal filings, solder
particles, oil, grease etc.

Note. Solvent products could cause damage to the system.

The boiler pack consists of the boiler, base panel, literature,
sealing washers and securing screws.

• Lay boiler on its back.

• Remove all packaging from around the boiler.

• Remove front panel, put in a safe place to avoid damaging it.

• Ensure the plastic plugs are removed from water and gas
pipes. NOTE: There will be some spillage of water.

• Remove transportation timber support bar from bottom rear of
boiler.

• If required the boiler can be stood upright supported by
extending the legs at the front bottom of the boiler.

• Engage boiler upper part onto the hanging bracket.

• Fit the washers between the boiler pipes and the inlet and
outlet fittings on the fixing jig and connect the various couplings
between the boiler and jig.

• Fit the base panel, hook in at the rear secure with the four self
tapping securing screws at the front.

9 Boiler installation

Advertising