12 Commissioning

3

Undo cap on
automatic air
vent on top of
pump and
leave undone.

Please ensure the “Benchmark” logbook is completed and left
with the user.

The commissioning and first firing of the boiler must only be
done by a qualified registered person.

Gas valve settings. Refer to Section 15 "Settings".

Gas installation

It is recommended that any air is purged from the supply at the
gas inlet test point on the gas valve, see diagram 12.1.

Filling the system 1 to 8

4

Hab 265

1

Press the mains 'On/Off' button

Hab 265

Open the system filling loop and fill the
system until the pressure indicated
on the display is between 1 and 2 bar.

Reg 008

9323

1.5

bar

mod

The pressure must be between 1 and 2 bar

Diagram 12.1

Open the boiler isolating valves
(v and q), the slot of the screw
corresponds to flow direction.
Fully open valve m by turning
anti-clockwise.

v

m

q

2

I

O

mode

0

1

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

1

7

18

1

9

2

0

21

22

23

24

0.0

bar

The display will indicate 0 bar pressure in the system

The warning light will illuminate

GAS INLET
TEST POINT