Adding sample – Labconco FreeZone 4.5 Liter Freeze Dry Systems 77510 Series User Manual

Page 24

Advertising
background image

Chapter 4: Using Your Freeze Dryer

Product Service 1-800-522-7658

20

containers or larger). The temperature required for pre-freezing is dependent on
the characteristics of the sample. Pre-freezing temperature typically is at least 10°
to 20°C below the eutectic or collapse temperature of the sample.

Adding Sample

The following procedure should be followed when using sample valves in the
freeze dry process:

1.

Connect a pre-frozen sample to a sample valve on the drying chamber or manifold

using an adapter. Turn the plastic valve knob to the “VACUUM” position to open
the valve. The bevel on the knob should be positioned toward the sample port to
apply vacuum to the sample.




2.

Before adding another sample, allow system vacuum to return to 0.133 mBar

or lower. Any combination of valves and sample sizes may be utilized at one
time provided that the system vacuum and collector temperature remain
sufficiently low to prevent melting of the frozen sample.

3.

When all the frost has disappeared from the outer surface of the sample

container and no cold spots can be detected by handling the container, the
sample is nearly dry. To be certain of low final moisture content, dry the
sample for several hours past this point.

4.

To remove a container after drying is complete, turn the plastic knob on the

valve to the “VENT” position, which closes the valve and vents the container.
Should backfilling with an inert gas be required, connect the gas supply line to
the vent port on the valve before turning the plastic knob on the valve to vent
position. The sample container may now be removed. In the vent position the
bevel on the valve knob should point away from the sample port.

Vent/Backfill Port

Bevel in “vent” position

Bevel in “vacuum”
position

Adapter

Advertising
This manual is related to the following products: