Final check – Vortech 2005-2009 Ford 4.6L 3V Mustang GT Air-Air Cooler User Manual

Page 49

Advertising
background image

P/N: 8N020-160

© 2008 Vortech Engineering

All Rights Reserved, Intl. Copr. Secured.

29DEC08v1.0(8N020-160v1.0)

41

5. FINAL CHECK

A.

Check all fittings, hose and clamps for

tightness and leaks. Make sure all wires

and lines are properly secure with clamps

or tie-wraps.

B.

Make sure all wires and hoses are routed

away from hot, moving or sharp objects.

C.

Custom Tuning: This kit requires custom

ECM calibration before the vehicle is to be

driven at any throttle opening greater than

50%. Calibration by a competent tuner

with a wide band 02 sensor and timing

monitoring equipment is required.

D.

Test drive the vehicle.

E.

Always listen carefully for engine detona-

tion. Discontinue heavy throttle usage if

detonation is heard.

NOTE: Do not attempt to operate the vehicle until ALL

components are installed and ALL operations are

completed including the final check.

Advertising