New supercharger pulley installation – Vortech 2007-2009 FORD GT500 OEM POWER PACK UPGRADE User Manual

Page 10

Advertising
background image

DP/N: 007125v1.0

© 2010 Vortech Engineering, LLC

All Rights Reserved, Intl. Copr. Secured.

27AUG2010 GT500 OEM POWER PACK

5


A.

Once the OEM pulley has been removed, remove

the tool from the pulley and shaft. Reconfigure the

tool as shown to install the new pulley. Ensure

that the free rolling face of the thrust bearing is

facing the flanged nut, and not the pulley and

washer. (See Figure 2-a)

B.

If needed, apply more lubricant to the threads of

the 5/8” screw and the bearing.

C.

Insert the tool through the new pulley as shown

D.

Thread the install tool into the center threaded

hole of the supercharger until the 5/8” screw seats

against the supercharger shaft. (See Figure 2-b &

2-c)

2.

NEW SUPERCHARGER PULLEY INSTALLATION

Fig. 2-a

Fig. 2-b

Fig. 2-c (pulley shown installed for clarity)

Advertising