New supercharger pulley installation, cont’d – Vortech 2007-2009 FORD GT500 OEM POWER PACK UPGRADE User Manual

Page 11

Advertising
background image

DP/N: 007125v1.0

© 2010 Vortech Engineering, LLC

All Rights Reserved, Intl. Copr. Secured.

27AUG2010 GT500 OEM POWER PACK

6

E.

Using the 15/16” wrenches/sockets, slowly drive

the new pulley onto the supercharger until the

washer seats the new pulley flush to the super-

charger pulley shaft. You will know it is flush when

the new pulley will not go in any further. (See

Figure 2-d)

F.

Verify the new pulley is flush to the supercharger

pulley shaft as shown. (See Figure 2-e)

G.

Re-insert the plastic cap into the supercharger

pulley shaft.

2.

NEW SUPERCHARGER PULLEY INSTALLATION, CONT’D

Fig. 2-d

Fig. 2-e

Advertising