Installation, General installation guidelines, 1 dimensions – Pilz PNOZ mc10p SERCOS III User Manual

Page 17: 5installation, 1 general installation guidelines

Advertising
background image

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]

5-1

5.1

General installation guidelines

5

Installation

5

5000

Installation

Installation

5-

5.1

General installation guidelines

5100

General installation guidelines

5-

Montage_multi_allgemein

The control system should be installed in a control cabinet with a pro-

tection type of at least IP54. Fit the control system to a horizontal

mounting rail. The venting slots must face upward and downward.

Other mounting positions could destroy the control system.

Use the notches on the rear of the unit to attach it to a mounting rail.

Connect the control system to the mounting rail in an upright position,

so that the earthing springs on the control system are pressed on to

the mounting rail.

The ambient temperature of the PNOZmulti units in the control cabi-

net must not exceed the figure stated in the technical details, other-

wise air conditioning will be required.

To comply with EMC requirements, the mounting rail must have a low

impedance connection to the control cabinet housing.

Montage_EMV ESD

5.1.1

Dimensions

Dimensions

5-

Abmessungen

CAUTION!

Damage due to electrostatic discharge!

Electrostatic discharge can damage components. Ensure

against discharge before touching the product, e.g. by touching

an earthed, conductive surface or by wearing an earthed arm-

band.

94 (3.70")

22,5

(0.88")

114 (4.49")

Advertising