Commissioning, General wiring guidelines, 6commissioning – Pilz PNOZ mc10p SERCOS III User Manual

Page 19: 1 general wiring guidelines

Advertising
background image

Pilz GmbH & Co. KG, Felix-Wankel-Straße 2, 73760 Ostfildern, Germany
Telephone: +49 711 3409-0, Telefax: +49 711 3409-133, E-Mail: [email protected]

6-1

6.1

General wiring guidelines

6

Commissioning

6

6000

Commissioning

Commissioning

6-

6.1

General wiring guidelines

6100

General wiring guidelines

6-

Verdrahtung_PNOZ mc2p

The wiring is defined in the circuit diagram of the PNOZmulti Configura-

tor.

It is possible to define which inputs and outputs on the safety system will

communicate with sercos III.

Please note:

Information given in the “Technical details” must be followed.

Use copper wire that can withstand 75 °C.

Please note the following when connecting to sercos III:

The following minimum requirements of the connection cable and

connector must be met:

– Only use standard industrial Ethernet cable and connectors.

– Only use double-shielded twisted pair cable and shielded RJ45

connectors (industrial connectors).

– 100BaseTX cable in accordance with the Ethernet standard (min.

Category 5)

Measures to protect against interference:

Ensure the requirements for the industrial use of sercos III are met,

as stated in the Installation Manual published by the User Group.

Verdrahtung_multi_Achtung_Kabel_spannungsl_ziehen_Modul

CAUTION!

Only connect and disconnect the expansion module when the

supply voltage is switched off.

Advertising