Preparing for operation
6
Commissioning
6.3
Preparing for operation
6300
Preparing for operation
6-
6.3.1
Download modified project to the PNOZmulti safety system
Download modified project to the PNOZmulti safety system
6-
Verdrahtung_multi_Modul_Betr_geaend_Projekt_BA
As soon as an additional expansion module has been connected to the
system, the project must be amended using the PNOZmulti Configura-
tor. Proceed as described in the operating instructions for the base unit.
6.3.2
Connection example
Connection example
6-
_Dummy-Vorlage
NOTICE
For the commissioning and after every program change, you
must check whether the safety devices are functioning correctly.
sercos III
Slave 2
sercos III
Master
sercos III
Slave 1
sercos III
Slave 3