Installation and connection – AXING SKP 2-10 User Manual

Page 6

Advertising
background image

Operation Instructions SKP 2-10

Chapter 2: Installation and connection

6

© AXING AG • Swizzerland • Reserving change in design and type

31.05.12

2

Installation and connection

The SKP 2-10 can either be operated in a headend basic unit SKS x-xx or in stand alone mode. SAT ZF
signals of the LNB(s) are either transmitted through a multiswitch or directly to SAT ZF inputs.
The maximum admissible current per SAT-ZT input is 250 mA.

2.1

Installation and connection in a headend base unit

If the SKP 2-10 should operate in a headend basic unit SKS x-xx, the twin module is plugged in the
output collection field c and fastened with screws. Each free slot may be used. The power supply of the
module is provided by the output collection field.

•

For detailed information on the headend base unit, refer to whose operating instructions.

•

Before inserting or changing a module, pull the mains plug of the headends basic unit from the socket!

Ground the base plate in order to avoid dangerous overvoltages according to EN 50083-1, EN 60728-
11:2010 (attention: risk of fire/death).

Important

Fig. 3: Installation and
connection in a headend

base unit

Notes

Advertising