Maximum demand variable, Period of maximum demand integration – CIRCUTOR CVM-C5 Series User Manual
Page 29

If the value entered is greater than the maximum programming value, the digits flash for 2
seconds and the programmed value is deleted.
Maximum programming value: 9.999.
Minimum programming value: 0.
4�6�10� Maximum demand variable
On this screen the variables to integrate into the Maximum
Demand concept are selected.
The display shows the digits that identify that code for the
variable to be integrated according to
Table 10: Codes for maximum demand variables
Parameter
Code
Active three-phase power
16
Apparent three-phase power
34
Three-phase current
36
None
00
The
key jumps between the different options.
To validate the information and go to the next programming step, press
.
4�6�11� Period of maximum demand integration
On this screen the maximum demand integration period is
programmed.
To enter or modify the integration period value, press the
key
repeatedly, increasing the value of the flashing digit.
When the on-screen value is that desired, press the
key to
go to the next digit to modify the other values.
If you press the
key after changing the last digit, it will jump back to the first digit so you
can modify the previously programmed values again.
The integration period may range from 1 to 60 minutes.
To validate the information and go to the next programming step, press
.
If the value entered is greater than the maximum programming value, the digits flash for 2
seconds and the programmed value is deleted.
29
Instruction Manual
CVM-C5