Pse90 flat screen electric wall mount – Future Automation PSE90 User Manual
Page 7
Advertising

Vertical height alignment
Carefully place the screen face down on
the floor and then fix the PSE90 to the
screen using the fixings supplied
Installation:
Stage 2
Page 6 of 1
7 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
PSE90 Flat Screen Electric Wall Mount
Measure the distance from the top of the
screen down to the top mounting hole on
the wall plate. From this measurement it
is possible to determine where to drill the
holes in the wall
Remove screen from the mount before attaching the mechanism to the wall
Advertising
This manual is related to the following products: