AMETEK Compact IX 2253 User Manual
Page 127

User Manual
2253i / 2253iX
AMETEK California
Instruments
127
FREQUENCY TRANSIENTS
(A(CF) only)
Test 1
Seq. No.
Volt/Frequency
Time
1 115/400
5
minutes
2 115/350 5
sec.
3 115/320
0.2
sec.
4 0/320
0.2
sec.
5 115V/400
10
sec.
Test 2
Seq. No.
Volt/Frequency
Time
1 115/400
5
minutes
2 115/480
0.2
sec.
3 115/440 5
sec.
4
0/440
0.2 sec.
5 115V/400
10
sec.
FREQUENCY TRANSIENTS
(Group 1 only)
Seq. No.
Frequency
Time
1 400
5
minutes
2 480 5
sec.
3 400
10
sec.
4 320 5
sec.
5 400
10
sec.
Table 9-14: Abnormal Frequency Transient
This test will set the voltage at 115V and will remain at this voltage through out the test except for the
A(CF) category. The test will cycle the frequency three times as shown in Table 9-14. Each repeat will
start from sequence 2. Test 1 and Test 2 for the A(CF) category are done in succession as a single
test.