Short-form operation instruction – Bronkhorst CEM W-300B User Manual

Page 5

Advertising
background image

BRONKHORST HIGH-TECH B.V.

Short-Form Operation Instruction

- Before installing your CEM system it is

important to check:

* flow rate

* fluids to be controlled/evaporated

* up- and downstream pressures

* output signals

* heater temperature

- Watch the red-coloured stickers and make sure the

testpressures are in agreement with normal safety

factors for your application.

- Check if the piping system is clean. Always install filters

to assure particle free fluids.

- Install the CEM system and tighten the fittings

according to the instructions of the supplier of the

fittings.

- Check the system for leaks before applying fluid

pressure.

- In systems with corrosive or reactive fluids, purging with

an inert gas is absolute necessary before use. Complete

purging after use with corrosive or reactive fluids is also

required before exposing the system to air.

- Apply the controlled power to the heatexchanger

and wait till the temperature is stabilised.

- Your CEM system is now ready for operation.

- Be sure that your liquid system is free of gas bubbles. If

needed remove the de-aerate plug on top of the CEM

control valve for de-aeration.