2 INSTALLATION

2.1 Receipt of equipment

Check the outside packing box for damage incurred during shipment. Should the packing box be damaged,

then the local carrier must be notified at once regarding his liability, if so required. At the same time a report

should be submitted to:

BRONKHORST HIGH-TECH B.V.

RUURLO HOLLAND

Remove the envelope containing the packing list; carefully remove the equipment from the packing box.

Do not discard spare- or replacement parts with the packing material and inspect the contents for damaged

or missing parts.

2.2 Return shipment

When returning material, always describe the problem and if possible the work to be done, in a covering

letter.

It is absolutely required to notify the factory if toxic or dangerous gases have been metered with the

instrument!

This to enable the factory to take sufficient precautionary measures to safe-guard the staff in their repair

department. Take proper care of packing, if possible use the original packing box; seal instrument in plastic

etc.

Contaminated instruments must be dispatched with a completely filled in 'declaration on contamination form'.

(In the back of this manual)

Contaminated instruments without this declaration will not be accepted.

Note:

If the instruments have been used with toxic or dangerous gases the customer should pre-clean the

instrument.

Important:

Clearly note, on top of the package, the customer clearance number of BRONKHORST HIGH-TECH B.V.,

namely:

NL801989978B01

2.3 Service

If this equipment is not properly serviced, serious personal injury and/or damage to the equipment could be

the result. It is therefore important that trained and qualified service personnel perform servicing.

BRONKHORST HIGH-TECH B.V. has a trained staff of servicemen available.

2.4 Mounting position

Preferably the CEM system is mounted in a vertical position, with the control valve section pointing upwards

and the vapour output pointing downwards.

Avoid installation in close proximity of mechanic vibration or strong heat sources.

2.5 Liquid filling

The purge connector can be used to remove the air from the liquid system. If available, use vacuum to de-

aerate the valve and liquid flowmeter before filling with liquid.