Chapter 2. installation, 1 unpacking and inspecting the shipment – Comtech EF Data MCED-100 User Manual
Page 31
Advertising

2–1
Chapter 2. INSTALLATION
2.1
Unpacking and Inspecting the Shipment
The MCED‐100 MetaCarrier® Embedding Device, its Installation and Operation Manual, and its
power cord were packaged and shipped in a reusable cardboard carton containing protective
foam spacing.
Figure 2-1. Unpacking and Inspecting the Shipment
This equipment contains parts and assemblies sensitive to damage by
Electrostatic Discharge (ESD). Use ESD precautionary procedures when
handling the equipment.
Advertising
This manual is related to the following products: