8 anb (connect block in series), 9 orb (connect block in parallel), 10 mps / mrd / mpp (branch instructions) – Delta DVP-ES2 User Manual

Page 16

Advertising
background image

D V P - E S 2 / E X 2 / S S 2 / S A2 / S X 2 / S E O p e r a t i o n M a n u a l - P r o g r a m m i n g

1-8

1.5.6 OR / ORI (Connect NO contact in parallel / Connect NC contact in parallel)

OR (ORI) instruction connects a NO (NC) in parallel with another device or block.

OR instruction

OR instruction

OR instruction

1.5.7 ORP / ORF (Connect Rising edge in parallel/ Connect Falling edge in parallel)

Similar to OR instruction, ORP (ORF) instruction connects rising (falling) edge triggers in parallel

with another device or block


1.5.8 ANB (Connect block in series)

ANB instruction connects a block in series with another block

ANB command

1.5.9 ORB (Connect block in parallel)

ORB instruction connects a block in parallel with another block

ORB instruction

1.5.10 MPS / MRD / MPP (Branch instructions)

These instructions provide a method to create multiplexed output branches based on current result

stored by MPS instruction.

Advertising
This manual is related to the following products: