DR Power VT1 (1-ton) (Feb 2012 - Present) User Manual

Page 13

Advertising
background image

CONTACT US AT

www.DRpower.com 13

Attaching the Front Bed Support, Operator Guard, Trailer Jack

&

Pivoting Tow Hitch w/Coupler

Tools Needed:

x

17mm, 18mm, and 24mm Wrenches or an Adjustable Wrench

x

16mm Socket

x

Tape Measure

1. Slide the Front Bed Support onto the Tow Bar with the Mounting Bosses

facing the Left, 9-1/2" from the end of the Main Frame (Figure 16).

2. Install and tighten two M12 x 50mm Bolts and Jam Nuts with an 18mm

Socket for the Bolts and an 18mm Wrench for the Nuts (Figure 17).

3. Slide the Operator Guard onto the Tow Bar with the Mounting Bosses

facing to the Left, 26" from the end of the Main Frame (Figure 16).

4. Install two M16 x 50mm Bolts with M16 Jam Nuts (Figure 18) into the

Operator Guard Bosses on the Right Side and tighten the Bolts with a
24mm Socket and the Jam Nuts with a 24mm Wrench or Adjustable
Wrench.

5. Slide the Trailer Jack 10-1/2" onto the Tow Bar (Figure 16), with the

Mounting Boss facing the Left side of the Trailer. Tighten the M16 x 50mm
Trailer Jack Bolt and M16 Jam Nut with a 24mm Socket and Wrench.

NOTE: You may need to loosen the Bolt installed in the Trailer Jack prior to

installation to be able to slide the Jack onto the Tow Bar.

9-1/2"

10-1/2"

26"

Figure 16

Mounting

Bosses

Mounting

Bosses

M16 x 50mm Bolt

w/Jam Nut

Figure 18

Figure 17

M12 x 50mm Bolt(s)

w/Jam Nut(s)

Advertising