a) Remove the bearing housing from the rotor

assembly.

b) Brush the bearing housing with hot kerosene (100

to 115 °C/212 to 240 °F) or other non-toxic solvent.

c) Clean and flush out the housing with a light mineral

oil.

d) Do not use waste oil to clean the housing.

To clean the bearings:
a) Wipe off as much grease as possible with a clean

lint-free cloth.

b) Brush bearings with hot kerosene (80 to 90 °C/ 175

to 195 °F) while gently spinning the outer bearing
ring.

c) Spin each ball to ensure that it is clean.


To remove badly oxidized grease which refuses to
come off:
a) Support the rotor in a vertical position and immerse

the bearing in hot kerosene or a mixture of alcohol
and light mineral solvent.

b) Gently spin the bearing outer ring.
c) Dry and reflush the bearing with clean light oil.
d) It is important not to under or over grease the

bearings as this will lead to over heating and
premature failure. It is recommended that the
bearings be filled with grease using a suitable
spatula. In addition the housings should be no
more than half filled.




6.3 Spare parts


6.3.1 Ordering of spares
Flowserve keep records of all pumps that have been
supplied. When ordering spares the following
information should be quoted:

1) Pump serial number
2) Pump size
3) Part name – taken from section 8
4) Part number – taken from section 8
5) Number of parts required


The pump size and serial number are shown on the
pump nameplate.

To ensure continued satisfactory operation,
replacement parts to the original design specification
should be obtained from Flowserve.
Any change to the original design specification
(modification or use of a non-standard part) will
invalidate the pump’s safety certification.

6.3.2 Storage of spares
Spares should be stored in a clean dry area away from
vibration. Inspection and re-treatment of metallic
surfaces (if necessary) with preservative is
recommended at 6 monthly intervals.

6.4 Recommended spares and
consumable items


For start up purposes:

1 - restriction bushing
2 - shaft sleeves
1 - set of gaskets and seals


For 2 years operation:

1 - set of bearings (line and thrust)
2 – restriction bushings
2 - shaft sleeves
2 - sets of gaskets and seals
1 - casing wear plate


For 4 years operation:

1 - set of bearings (line and thrust)
2 – restriction bushings
2 - shaft sleeves
2 - sets of gaskets and seals
2 - casing wear plate
1 - impeller

6.5 Tools required

A typical range of tools that will be required to maintain
these pumps is listed below.

Readily available in standard tool kits, and dependent
on pump size:

Open ended spanners (wrenches) to suit up to
M 48 screws/nuts

Socket spanners (wrenches), up to M 48 screws

Allen keys, up to 10 mm (A/F)

Range of screwdrivers

Soft mallet

More specialized equipment:

Bearing pullers

Bearing induction heater

Dial test indicator

C-spanner (wrench) - for removing shaft nut.
(If difficulties in sourcing are encountered, consult
Flowserve.)