Installation – Flowserve NRG 16-40 User Manual

Page 15

Advertising
background image

5

Attention

The seating surfaces of the standpipe or the flange provided on the vessel must be

accurately machined, see

Fig. 7, Fig. 12.

Do not bend electrode tip when mounting.

Use only ring joint (of stainless steel .430) D 7 x 3 (D 33 x 39 for NRG -40)

to DIN 7603 supplied with the electrode.

Do not lag electrode body above the hexagonal section,

Fig. 5, Fig. 9.

Do not insulate electrode thread with hemp or PTFE tape.

Do not screw electrode directly into a screwed socket,

Fig. 6, Fig. 11.

Observe min. spacing when installing the electrode, Fig. 10, Fig. 15, Fig. 19.

Note

For the approval of the boiler standpipe the relevant regulations must be considered.

Refer to pages 6 and 7 for typical installation examples.

Tools

Open-end spanner A. F. 7 mm

Open-end spanner A. F. 4 mm

Installation

NRG 16-40, NRG 17-40, NRG 19-40, NRG 111-40, step 1

. Screw electrode tip

D

into measuring electrode

A

, Fig. 4, Fig. 8.

. Carefully determine required measuring length of electrode. Observe min. length,

Fig. 2, Fig. 3.

3. Mark length of electrode tip

D

.

4. Unscrew electrode tip

D

from measuring electrode

A

and cut tip.

5. After visual inspection screw electrode tip

D

into measuring electrode

A

. Slide spring

C

along

electrode tip

D

, so that its bent end completely enters into small bore

B

.

Hacksaw

Flat file, medium cut

NRG 16-40, NRG 17-40, NRG 19-40, NRG 111-40, step 2

. Check seating surfaces,

Fig. 7, Fig. 12

. Place ring joint

E

onto seating surface

F

of electrode,

Fig. 5, Fig. 9

3. Apply a light smear of silicone grease (e.g. Molykote

®

) to electrode thread

G

.

4. Screw level electrode into threads of flange provided on vessel and tighten with

a 4 mm open-end spanner. The torque required is

160 Nm when cold, for NRG -40 475 Nm.

5.

When installing two electrodes together in one flange install the first electrode as described in 4.

Before mounting the second electrode undo plug

O, remove PE connection N and strip cable lugs

from the board. Screw in electrode. Slightly tighten plug

O. Install PE connection N and insert

cable lugs.

Molykote

®

 is a registered trademark of DOW Corning Corp., Midland Michigan, USA