Installation – Flowserve NRG 16-40 User Manual

Page 15

Advertising
background image

5

Attention

■

The seating surfaces of the standpipe or the flange provided on the vessel must be

accurately machined, see

Fig. 7, Fig. 12.

■

Do not bend electrode tip when mounting.

■

Use only ring joint (of stainless steel .430) D 7 x 3 (D 33 x 39 for NRG -40)

to DIN 7603 supplied with the electrode.

■

Do not lag electrode body above the hexagonal section,

Fig. 5, Fig. 9.

■

Do not insulate electrode thread with hemp or PTFE tape.

■

Do not screw electrode directly into a screwed socket,

Fig. 6, Fig. 11.

■

Observe min. spacing when installing the electrode, Fig. 10, Fig. 15, Fig. 19.

Note

■

For the approval of the boiler standpipe the relevant regulations must be considered.

■

Refer to pages 6 and 7 for typical installation examples.

Tools

■

Open-end spanner A. F. 7 mm

■

Open-end spanner A. F. 4 mm

Installation

NRG 16-40, NRG 17-40, NRG 19-40, NRG 111-40, step 1

. Screw electrode tip

D

into measuring electrode

A

, Fig. 4, Fig. 8.

. Carefully determine required measuring length of electrode. Observe min. length,

Fig. 2, Fig. 3.

3. Mark length of electrode tip

D

.

4. Unscrew electrode tip

D

from measuring electrode

A

and cut tip.

5. After visual inspection screw electrode tip

D

into measuring electrode

A

. Slide spring

C

along

electrode tip

D

, so that its bent end completely enters into small bore

B

.

■

Hacksaw

■

Flat file, medium cut

NRG 16-40, NRG 17-40, NRG 19-40, NRG 111-40, step 2

. Check seating surfaces,

Fig. 7, Fig. 12

. Place ring joint

E

onto seating surface

F

of electrode,

Fig. 5, Fig. 9

3. Apply a light smear of silicone grease (e.g. Molykote

®

) to electrode thread

G

.

4. Screw level electrode into threads of flange provided on vessel and tighten with

a 4 mm open-end spanner. The torque required is

160 Nm when cold, for NRG -40 475 Nm.

5.

When installing two electrodes together in one flange install the first electrode as described in 4.

Before mounting the second electrode undo plug

O, remove PE connection N and strip cable lugs

from the board. Screw in electrode. Slightly tighten plug

O. Install PE connection N and insert

cable lugs.

Molykote

®

 is a registered trademark of DOW Corning Corp., Midland Michigan, USA

Advertising
This manual is related to the following products: