Prepare the Analyzer for use as follows:

1. To start from the same position each time, place the Analyzer's switches in

the following starting positions:

FUNCTION switch

V- LINE VOLTS

LEAD switch

RL

NEUTRAL switch

CLOSED

OUTLET switch

OFF [center]

2. Plug the Analyzer into a properly rated outlet.

The Analyzer is equipped with a hospital-grade power plug. Grounding
reliability can be achieved only when the Analyzer is connected to an
equivalent power receptacle marked "Hospital Grade." Grounding is
important for personnel safety and to make some of the tests offered by
the Analyzer. Do not circumvent this step for any reason.

Verifying the Power Outlet Connections

Note

Not applicable to isolated power systems.

Three neon lamps indicate the polarity and condition of the outlet being used,
as shown in the following chart:

REV

OK

Correct

wiring

Reverse

polarity

Open

ground

Open hot

Open

neutral

Hot /

ground

reversed

Note

Review all power outlets that do not indicate "correct wiring" and
have them corrected by a qualified electrician.

If the line is found faulty, correct the problem before proceeding. If the line
checks OK, plug the device to be tested into the Analyzer's line receptacle.

Advertising
This manual is related to the following products: