Fronius Selectiva Plus (three-phase) User Manual

Page 42

Advertising
background image

12

Relay board
option

(continued)

Connecting lines to the relay board
1.

Disconnect charger from the mains

2.

Disconnect the battery

3.

Remove housing cover

4.

On the relay board, connect the analysis lines to connections (1) to (12)

5.

On the front of the housing (mains cable side), put the analysis line through the
pre-installed bushing (PG 11)

6.

Fit housing cover

6X9

6X8

6X7

6X6

Error message

Battery 100%

charged

Battery 80%

charged

Charging in

progress

Fig. 9 Relay board: connecting the analysis lines

Max.: 250 V AC/DC, 2 A/cable

Relay board option on 14-pin plug prewired in factory.

Pin configuration relay board A6 SEL-REL-A / 14 pin plug connector AMP (X9)/ control
line

Connection
socket relay
board option