Step 2: assemble main curb – Greenheck ERV-522/90 Curbs (460988) User Manual
Page 2
Advertising

2
STEP 2: Assemble Main Curb
Hardware Required: (24)
3
/
8
-16 x
3
/
4
Serrated Flange Bolts
(24)
3/8
-16 x
3
/
4
Serrated Flange Nuts
(2) End Channels
(1)
Center
Channel
(2) Non-Supply Side Channels
(2)
Supply
Side
Channels
Instructions: •
See
Main Curb Assembly for positioning the Side, Center, and End Channels.
• Align the holes and fasten as shown below.
Main Curb Assembly
Supply Side Channels
Side and center channels
fasten together, as shown.
Non-Supply Side Channels
End and side channels
fasten together, as shown.
L
W
End
Channel Lengths and Overall Curb Dimensions
Non-Supply
Length
Supply
Length
End
Length
Center
Length
L
W
ERV-522/90
58.37
58.63
80.50
80.50
120.50
80.50
ERV-582/120
64.88
73.87
92.75
92.75
142.25
92.75
All dimensions in inches.
Advertising
This manual is related to the following products: