Mounting for severe duty installation – Greenheck SFD, SFB, SWB and SWD (455308) User Manual

Page 7

Advertising
background image

Centrifugal Utility Fans

7

®

Equipment Support Anchoring

One fastener per isolator anchoring.
Four isolators required.

Mounting for Severe Duty Installation

Isolator Anchoring

Two fasteners per equipment support.
Three supports required for model sizes 20 and larger.

Isolator Anchoring

18 Ga. Galvanized G90
with Wood Nailer

Three Supports Required
for Sizes 20 and larger

Equipment Support Anchoring

Min. 5 inch

(127 mm)

5/16 inch (8 mm) Self-D rilling Screw
Min. 1/2 inch (13 mm) of Threads Through

Roof Truss
1/8 inch (3 mm) Thick
or 12 Gauge Min.

Steel

Deck Anchoring

Concrete

Deck Anchoring

2000 Min. PSI
Concrete

Timber Anchoring

7/16 inch (11 mm) Lag Bolt
Min. 3-1/4 inch (83 mm) Thread Engagement

Wood Timber
Min. 4 inch (102 mm)
Min. G = 0.42

1/2 inch (13 mm) - 13 Bolt
(Four Locations)

1/2 inch (13 mm) - 13 Bolt
(Four Locations)

5/8 inch (16 mm) Lag Screw
Min. 1-1/2 inch (38 mm) Thread Engagement
(Two per Equipment Support)

5/8 inch (16 mm) Lag Screw
Min. 1-1/2 inch (38 mm) Thread Engagement
(Two per Equipment Support)

3/8 inch (10 mm) S.S. Hilti Kwik Bolt
Three Expansion Anchors
Min. 2-1/2 inch (64 mm) Engagement

3/8 inch (10 mm) S.S. Hilti Kwik Bolt
Three Expansion Anchors
Min. 2-1/2 inch (64 mm) Engagement

Advertising