Greenheck Energy Recovery and Make-Up Air Start-Up Report User Manual
Page 5

5
Condenser Airflow
S
6
6
4
8
5
3
12
4
4
1
2
14
13
11
10
9
Supply
Airflow
P1
P2
T1
T2
Packaged DX Cooling with Digital Scroll Compressor
Water-Source Heat Pump with Standard Scroll Compressor
Supply
Airflow
Water In
Water Out
M
4
7
8
5
5
10
12
11
13
2
3
6
1
9
T4
T3
1. Compressor
2. High Limit Pressure Switch
3. Hot Gas Reheat Valve
(optional)
4. Hot Gas Reheat Coil
5. Hot Gas Reheat Check Valve
6. Condenser Fans
7. Condensing Coil
8. Liquid Receiver (optional)
9. Sight Glass
10. Liquid Line Filter Drier
11. Thermostatic Expansion
Valve (TXV)
12. Evaporative Coil
13. Low Limit Pressure Switch
1. Compressor
2. High Limit Pressure Switch
3. Hot Gas Reheat Valve
(optional)
4. Hot Gas Reheat Coil
5. Hot Gas Reheat Check Valve
6. Liquid Receiver (optional)
7. Liquid Line Filter Drier
8. Thermostatic Expansion
Valve (TXV)
9. Low Limit Pressure Switch
10. Hot Gas Bypass Valve
(optional)
11. Airside Coil
12. Coaxial Refrigerant-to-Water
Heat Exchanger
13. Reversing Valves