Rod rigging – Harken 7311.10 Cruising Jib Reefing & Furling User Manual

Page 16

Advertising
background image

Insert two cotter pins and

spread. Clean excess Loctite

®

from terminal body using

special care to ensure that

there is no red Loctite

®

on threaded stud.

Assembly

Rod Rigging: Rod Adapter Stud

Apply a few drops of red

Loctite

®

to threads of

nosepiece.
Screw main threaded stud

portion onto bronze nosepiece

until flats align with two cotter

pin holes in terminal body.
Tip: Turn nosepiece

completely into threaded

stud portion. Flats will be

close and may only require

a small half turn to align

with cotter pin holes.

ROD RIGGING

16

Unit 1, 2 Cruising

5/30/08

Advertising
This manual is related to the following products: