Venting installation instructions, Continued – Desa (V)K36EN SERIES User Manual

Page 9

Advertising
background image

www.desatech.com

111924-01D

9

VENTING INSTALLATION

INSTRUCTIONS

Continued

Figure 11 - Installing Siding Standoff

(Combustible Exterior)

Vent Cap

(Horizontal

Termination)

Interior Wall

Surface

Wall

Firestop

Horizontal

Vent Pipe

Figure 12 - Connecting Vent Cap with Horizontal Vent Pipe

Screw

Cut Siding Away

to Fit Standoff

Wood Screw

Screws

Standoff

Vent Cap

Apply Mastic to

All Four Sides

7.

Combustible Exterior Wall Only:

Slide the wall firestop over

the vent pipe before connecting horizontal run to vent cap (see

Figure 12).

8. Carefully move fireplace, with vent assembly attached, toward

wall and insert vent pipe into horizontal termination. The pipe

overlap should be a minimum of 1

1

/

4

".

9.

Combustible Exterior Wall Only:

Slide wall firestop against

interior wall surface and attach with screws provided. See

Figure 13 for horizontal termination details.

10. Place fireplace into position and shim with noncombustible

material if needed. Nail or screw side flanges to framing to

secure unit in place. IMPORTANT: Make sure fireplace is

level before securing. If fireplace is not level it will not work

properly.

Figure 13 - Typical Horizontal Termination Cap Mounting with

Additional Siding Standoff Installed

Siding Standoff

Screws

High Wind

Termination

Apply Mastic to

Outside Edge of

Standoff

Exterior Wall

with Vinyl Siding

10

3

/

4

" x 10

3

/

4

"

Framed Opening

Maintain 1"

Minimum Air

Space Around

Outer Pipe When

Penetrating a Wall

Minimum Pipe

Overlap 1

1

/

4

"

Wall

Firestop

Direct Vent

Pipe

Advertising