Water source heat pump module, Start-up & commissioning, Technical guide 10 – Orion System Water Source Heat Pump Module User Manual

Page 10: General

Advertising
background image

Water Source Heat Pump Module

Technical Guide

10

Start-Up & Commissioning

General

In order to have a trouble free start-up, it is important to follow a few
simple procedures. Before applying power for the fi rst time, it is very
important to run through a few simple checks.

One of the most important checks to make before powering up the system
for the fi rst time is to make sure that the VCM-X WSHP Controller is
confi gured properly for your application. Refer to the VCM-X Controller
Technical Guide
for more information. A handheld Modular Service Tool,
Modular System Manager, or System Manager Touch Screen connected
to the VCM-X WSHP Controller will allow you to confi gure your ap-
plication. Refer to the VCM-X Operator’s Interfaces Technical Guide or
System Manager TS Technical Guide for more information.

Table 1: Unit Confi gurations

UNIT CONFIGURATIONS

PERMUTATION

CIRCUIT A

CIRCUIT B

VCM-X WSHP

CONFIGURATION

Comp A1

Comp A2 Comp B1

Comp B2

Relay 1

Relay 2

Relay 3

Relay 4

1

Fixed

N/A

Fixed

N/A

2 Compressors

2

Digital

N/A

Fixed

N/A

2 Compressors
Digital Compressor

3

Digital

N/A

Digital

N/A

2 Compressors
Dual Digital

4

Fixed

Fixed

Fixed

Fixed

4 Compressors

5

Digital

Fixed

Fixed

Fixed

4 Compressors
Digital Compressor

6

Digital

Fixed

Digital

Fixed

4 Compressors
Dual Digital

The Compressors will stage in the following order:

Permutations 1, 2 & 3: Circuit A, 1

st

Compressor (A1) -> Circuit B, 1

st

Compressor (B1)

Permutations 4 & 5: Circuit A, 1

st

Compressor (A1) -> Circuit A, 2

nd

Compressor -> (A2)

Circuit B, 1

st

Compressor (B1) -> Circuit B, 2

nd

Compressor (B2)

Permutations 6: Circuit A, 1

st

Compressor (A1) -> Circuit B, 1

st

Compressor (B1) ->

Circuit A, 2

nd

Compressor (A2) -> Circuit B, 2

nd

Compressor (B2)

Check all wiring leads at the terminal block for tightness. Be sure that
wire strands do not stick out and touch adjacent terminals. Confi rm
that all sensors required for your system are mounted in the appropriate
location and wired into the correct terminals.

WARNING: Observe polarity! All boards must be wired

GND-to-GND and 24 VAC-to-VAC. Failure to

observe polarity could result in damage to the

boards.

Advertising